The Telecom Project Phase I has been commenced from July, 2001 and completed in July, 2002:

  • Completed to install 1 main PSTN Switching Center and 10 Outside Plan Networks with capacity 10.000 subscribers.
  • Completed to install 1 Mobile Switching Center (1MSC) and installed 17 Base Transmission System  (BTS)  with capacity 10.000 subscribers.
  • Installed 4-stage Microwave Transmissions in Vientiane Capital.
  • Installed 1 Billing System with capacity 10.000 subscribers.
  • Installed 1 Internet Network in VoIP System.    
   
   
 
 
 